- One-sixth of a
mile long; consists of abrasive surfaces, water and mud troughs, and
various obstacles for testing footwear
- The abrasive surfaces
include crushed quartz, chipped and cubed granite, cinders, sand, gravel,
slag, and smooth and rough concrete
- A five-step concrete
stile with an abrasive surface and an edge walk used for
testing the durability of the uppers of footwear
- Stairway with a
double jump for evaluating the overall durability of footwear
FOR ADDITIONAL INFORMATION:
Warfighter Directorate, 410-278-4277, email atcwd@atc.army.mil
|